Skip to content

Free technical reference for homeowners, surveyors, and building professionals

How buildings are built, why they fail, how they are repaired — plus fire safety, blocks, tenancy, planning, BIM, guides, and tools

Buildopedia is a free encyclopaedia of construction types, building defects, and established repairs, written from surveying and maintenance practice. Also included are fire safety and Building Safety Regulator duties, residential block management (including Section 20), historic buildings, BIM and ISO 19650, procurement, planning, and tenancy and habitability, plus step-by-step guides, free and premium tools, and links to official professional registers. Content covers the UK & Ireland, Southeast Asia, North America, and hot-arid regions — building physics is the same wherever you are; we highlight the laws that apply in each place.

Use it as a reference when you need to check an issue or understand the likely cause and next steps. It can help you choose a sensible course of action, point you toward the right kind of professional, and lead you to the relevant British Standards, Approved Documents, or statute. Professional advice is still recommended for decisions on a particular building.

Useful for

  • Homeowners — damp, mould, repairs, and who does what
  • Surveyors — building-defect records and graded remedies
  • Managing agents — blocks, fire doors, Section 20, and Golden Thread
  • Practitioners — BIM, planning, procurement, and registers

This is not

  • A survey or diagnosis of your particular property
  • A paid list of contractors or products
  • A guaranteed answer from the free symptom checker
  • A replacement for standards, Approved Documents, or the law

General technical information — not a survey, a specification, or advice on a particular property. The same stain can have more than one cause. A repair that is established for one of them can damage the building if the cause is wrong. Instruct a competent local professional before opening up structure or paying for a remedy.

Disciplines

Browse the main sections of the encyclopaedia, guides, tools, and professional registers.

  • Construction

    24 topics

    How walls, floors, and roofs are put together around the world — and how methods differ by region and climate.

  • Defects

    32 topics

    Damp, mould, movement, and other failures — with checks that help tell likely causes apart.

  • Remedies

    32 topics

    Repairs graded Established, Conditional, or Caution, matched to the cause — not a shopping list.

  • Fire safety

    9 topics

    Fire doors, compartmentation, and England Building Safety Regulator duties, with notes for other codes.

  • Residential blocks, service charges, and Section 20 — plus condo and strata counterparts elsewhere.

  • Traditional construction, mortars, roofs, and heritage recording across regions.

  • BIM

    7 topics

    ISO 19650 information management, COBie/IFC handover, digital twins, and heritage BIM.

  • Procurement

    10 topics

    How projects are bought, and how information duties fit into the appointment.

  • Planning

    8 topics

    Planning versus Building Regulations in England, with notes on how similar controls work in other countries.

  • Tenancy

    12 topics

    Landlord and tenant roles, habitability, repair clauses, and damp without blame.

  • Guides

    37 topics

    Step-by-step procedures for damp, fire doors, planning applications, and BIM workflows.

  • Tools

    11 topics

    Free triage helpers and premium pack generators for site and desk work.

  • Professionals

    21 topics

    Official registers by country and region — not a paid contractor directory.

Evidence grades on remedies

When you open a repair record, these grades tell you how well supported that repair is for a matching cause.

Established

Established

The repair described in mainstream standards once the cause matches.

Conditional

Conditional

Appropriate only for the specific failure it was designed for.

Caution

Caution

Often marketed hard, or known to trap moisture in traditional fabric.

Investigating a building

Search the records, or start from what you can see

Condensation, penetrating damp, and rising damp are different problems — a handheld meter cannot separate them alone (BRE Digest 245). Browse the defects records and investigation guide, or check a symptom to narrow the likely causes.

Commonly confused causes include surface condensation, interstitial condensation, penetrating damp, and rising damp.

Authority & scope

Aligned with RICS and CIOB practice standards; not an official publication of those bodies. Author credentials and professional background: /about. Official registers for appointing professionals: /find.

Construction records are grouped by climate and building tradition — UK & Ireland masonry/cavity stock; Southeast Asian RC frames, raised timber, and shophouses; North American light timber platform frame, CMU, and ICF; hot-arid adobe/rammed earth and thick masonry courtyards. Groups describe how walls and roofs are built, and how they fail, not a substitute for local permits or national codes.